Skip to main content

Posts

Showing posts from November, 2022

What to consider when migrating a DataCenter ?

 Few glimpse of learning for successful DataCenter Migration I am sharing for knowledge purpose. Comprehensive Migration plan Assigned Project Manager/Owner Environment prerequisites Hardware prerequisites Software prerequisites Task prerequisites Key team players (who will be involved in data center relocation?) Key data for every phase of your data center relocation project Back-out plan Planning and Methodical Implementation Label cabling in existing and target data centers Backups complete DBAs and application administrators disable services Turn off and shut down all data center equipment A network administrator checks cabling, switch configuration, and firewall connectivity OS Manager remotely connects to the console to reconfigure the network settings for the service (if not done before shutdown) OS Manager checks the health of the operating system, network connections, and storage Allowable Downtime server, network, storage, and operating system requirements DBAs and applicatio